Glass / ProcessOnline Leak Sealing2024

Online Leak Sealing at Saint-Gobain India, Wada

₹1.0 Lakh online leak sealing for Saint-Gobain process pipeline

Client
Saint-Gobain India Pvt Ltd
Plant
Glass Manufacturing Plant
Location
Nare-Vadavali, Wada (Palghar), Maharashtra
Duration
Apr 2024
Project Summary

Saint-Gobain India operates a major glass manufacturing facility at Wada in Palghar district. A process pipeline developed a steam leak during operation. M.S. Enterprises was contracted to perform online leak sealing — sealing the leak at full operating pressure without plant shutdown.

Scope of Work

Detailed work package delivered under this contract.

  • On-site leak assessment and sealant compatibility check
  • Specialised injection equipment deployment
  • Live pipeline leak sealing at operating pressure
  • Post-seal inspection and pressure-hold verification
The Challenge

Steam leak on pipeline serving the glass-melting furnace. Plant shutdown to repair would have meant minimum 48-hour production loss — equivalent to several lakh INR of revenue. Plant required leak resolution without operational shutdown.

Our Solution

M.S. Enterprises deployed specialist online leak sealing crew with high-pressure injection equipment. Engineer assessed leak geometry, selected compatible sealant grade (steam-rated, high-temperature). Sealing performed at full operating pressure within a 4-hour window without plant shutdown.

Materials Used

Manufacturer-grade materials sourced direct, with full batch certification.

MaterialSpecificationQuantity
Steam-rated injection sealantService 250°C, 40 barPer leak volume
Specialised injection equipmentHigh-pressure delivery system1 set deployed
Outcome

Delivered & verified.

  • Leak sealed within 4 hours, no plant shutdown
  • Production continuity maintained throughout
  • Several lakh INR of production loss avoided
  • Post-seal pressure-hold verified successful