Plant
Sponge Iron + Captive Power Plant
Location
Raipur, Chhattisgarh
Duration
Q4 2024 — planned shutdown
Project Summary

Godawari Power & Ispat operates a major sponge iron and captive power complex at Siltara, Raipur. WHRB-14 (Waste Heat Recovery Boiler unit 14) had reached end of refractory campaign life and required full relining during the planned 2024 shutdown. M.S. Enterprises was awarded the ₹28.6 Lakh refractory application contract.

Scope of Work

Detailed work package delivered under this contract.

  • Demolition and disposal of worn refractory lining
  • Anchor inspection, replacement and re-welding (MS + SS-310)
  • High-alumina castable casting — furnace walls, transition ducts
  • Gunning spray cement application — high-velocity wear zones
  • High-alumina brick lining — hot-zone arches
  • Insulating castable backup
  • Dry-out and post-cure inspection
The Challenge

Sponge iron WHRBs operate with high dust loading — refractory wear is faster than conventional thermal-power boilers. Previous campaign had failed at 14 months. Plant wanted improved abrasion-resistant material specs and stricter execution discipline to extend campaign life beyond 24 months.

Our Solution

Material specification upgraded — switched cyclone hot-zone gunning from 60% to 80% Al₂O₃ for better abrasion resistance. Anchor density increased 18% in high-wear zones. Casting consolidation verified at every 0.5 m³ batch. Dry-out ramp slowed from 35°C/hr to 25°C/hr for first 150°C to prevent thermal-shock micro-cracks.

Materials Used

Manufacturer-grade materials sourced direct, with full batch certification.

MaterialSpecificationQuantity
High-Alumina CastableAl₂O₃ 70%, abrasion-resistant~15 MT
Gunning Spray CementAl₂O₃ 80%~6 MT
High-Alumina BricksAl₂O₃ 70%, custom shapes~4 MT
SS-310 V-AnchorsLength 120mm, Gauge 8mm~1.2 MT
Outcome

Delivered & verified.

  • Refractory campaign completed within shutdown window
  • Material specifications upgraded for abrasion resistance
  • Hand-over QA package: batch certs, weld inspection, dry-out logs
  • Plant currently operating with refractory in service — campaign tracking ongoing