Thermal PowerRefractory Application2024

Refractory Works Contract at LANCO Anpara — UP Power Belt

₹57.4 Lakh refractory works contract — boiler furnace + cyclone refractory campaign

Client
LANCO Anpara
Plant
1,200 MW Coal-Fired Power Plant
Location
Anpara, Sonebhadra, Uttar Pradesh
Duration
Sep 2024 — major shutdown campaign
Project Summary

LANCO Anpara is one of India's largest CFBC power plants in the Sonebhadra-Singrauli belt. M.S. Enterprises was awarded the 2024 refractory works contract covering castable application, gunning of cyclone hot zones, anchor fabrication and welding, and ceramic-fibre insulation for the boiler furnace and connected ducts.

Scope of Work

Detailed work package delivered under this contract.

  • Castable refractory application — boiler furnace water-wall studs, ash hopper sections
  • High-alumina gunning spray cement — cyclone separator hot zones
  • MS / SS-304 V-anchor and Y-anchor fabrication and welding
  • Plastic refractory hand-ramming — irregular geometries near burner zones
  • Ceramic fibre blanket and LRB mattress backup insulation
  • Final dry-out with controlled ramp per OEM TDS
The Challenge

LANCO Anpara operates on tight shutdown windows. Refractory failure of cyclone hot zones in the previous campaign had caused unplanned outage. Plant required a full-scope partner who could deliver castable casting, gunning, anchor work and dry-out within the 14-day shutdown — without coordination disputes between separate vendors.

Our Solution

M.S. Enterprises bid as single-vendor for the entire refractory works package — material supply, application, anchor fabrication and dry-out under one project manager. Two parallel work fronts deployed: Front A handled boiler furnace castable + anchor work; Front B handled cyclone gunning. Senior supervisor with 12-year CFBC experience oversaw both. All material grades sourced direct from approved manufacturers.

Materials Used

Manufacturer-grade materials sourced direct, with full batch certification.

MaterialSpecificationQuantity
High-Alumina CastableAl₂O₃ 70%~25 MT
Gunning Spray CementAl₂O₃ 80%~12 MT
SS-304 V-AnchorsLength 100–150mm, Gauge 8mm~2.4 MT
Ceramic Fibre Blanket128 kg/m³, 1260°C, 25mm~600 m²
Plastic RefractoryAl₂O₃ 70%, phosphate-bonded~3 MT
Outcome

Delivered & verified.

  • Full scope completed within 14-day shutdown window
  • Hand-over with batch certificates, anchor weld inspection records, casting consolidation checks, dry-out chart-recorder logs
  • Zero rework requested during commissioning
  • Plant operations resumed on schedule with no thermal-shock incidents